SUPER 2.0
5 MGPY / 50 TPD
SUPER™ 2.0
10 MGPY / 100 TPD
SUPER™ 2.0
15 MGPY / 150 TPD
SUPER 2.0
Custom
Plant Capacity 5 MGPY or 50 TPD 10 MGPY or 100 TPD 15 MGP or 150 TPD >15 MGPY/150 TPD
Flow 10 GPM 20 GPM 30 GPM TBD
Oper. days per year 350 350 350 350
Technology SUPER™ 2.0 SUPER™ 2.0 SUPER™ 2.0 SUPER™ 2.0
Area Required 2 to 3 Acres 2 to 3 Acres 2 to 3 Acres TBD
Feedstock FFA up to 100% up to 100% up to 100% up to 100%
Feedstock Type All listed in RFS2 All listed in RFS2 All listed in RFS2 All listed in RFS2
Power Req. 480V 0.6 MW 0.75 MW 1.0 MW TBD
Boiler/Cooling Tower Load MMBTU 8 MMBTU 18 MMBTU 35 MMBTU TBD
Air Compressor 150 SCFM @ 150PSIG 150 SCFM @ 150PSIG 150 SCFM @ 150PSIG 150 SCFM @ 150PSIG
Instruments Com. 4 to 20 mA 4 to 20 mA 4 to 20 mA 4 to 20 mA
Automation, DCS Delta-V Delta-V Delta-V Delta-V
 I/O Cabinet’s  CHARMs, Emerson  CHARMs, Emerson  CHARMs, Emerson  CHARMs, Emerson
 All Vessels, Columns, Heat Exchangers and Reactors. 304/316 SS
ASME Stamp
 304/316 SS
ASME Stamp
 304/316 SS
ASME Stamp
 304/316 SS
ASME Stamp
 All Pumps & Mixers rating and wiring to the eqp.  Class.1, Div.2  Class.1, Div.2  Class.1, Div.2  Class.1, Div.2
 Process Piping that are low, medium & high pressure  As per ASME B31.3
HP piping, X-Ray
 As per ASME B31.3
HP piping, X-Ray
 As per ASME B31.3
HP piping, X-Ray
 As per ASME B31.3
HP piping, X-Ray
 Boiler Piping, medium pressure  As per ASME B31.1
Incld. Exp Analysis
 As per ASME B31.1
Incld. Exp Analysis
 As per ASME B31.1
Incld. Exp Analysis
 As per ASME B31.1
Incld. Exp Analysis

Engineering Package (Standard)

Eng. Deliverables 5 MGPY / 50 TPD 10 GMPY / 100 TPD 15 MGPY / 150 TPD > 15 MGPY / 150 TPD
 Process Flow Diagrams (PFD)  Yes   Yes   Yes   Yes
 Process & Instrumentation Drawings (P&ID)   Yes   Yes   Yes   Yes
 Heat, Material & Mass Balance (HM&MB)   Yes  Yes   Yes   Yes
 HAZOP / PHA Participation  Optional   Optional   Optional   Optional
 Equipment Specification Sheets    Yes    Yes    Yes    Yes
 RFQ from all Process EQP. from Vendors    Yes    Yes    Yes    Yes
 Functional Requirements (FR)    Yes    Yes    Yes    Yes
 Standard Operating Procedures (SOP)  Optional   Optional   Optional   Optional
 Elevation & Orientation Drawings  Yes  Yes  Yes  Yes
 Structural Analysis & Drawings  Yes Yes  Yes  Yes
 Piping ISO Drawings, incld. analysis work  Yes  Yes Yes  Yes
 Drawings for Automation Architecture, I/O & DCS Panel, Inst. wiring and BOM  Yes  Yes  Yes  Yes
 Electrical Drawings for MCC, wiring to pumps & mixers, I/O panels, DCS panels and heat tracing panels.  Yes  Yes  Yes  Yes
 Process Guarantee for Yield, Biodiesel Quality & Heat Load Consumption. Yes Yes  Yes  Yes
 Building, Fire Sprinkler, Electrical to the building & plant, plumbing, concreted and any civil related work.  Out of Scope
Engage Civil Eng.
Out of Scope
Engage Civil Eng.
 Out of Scope
Engage Civil Eng.
Out of Scope
Engage Civil Eng.

Procurement Package (Optional)

Project Management Yes Yes Yes Yes
Eng. Inspection Yes Yes Yes Yes
Plant Commissioning Yes Yes Yes Yes
Plant Start-up Yes Yes Yes Yes

Construction Package (Optional)

Account Management Yes Yes Yes Yes
RFQ and Selection of Vendors Yes Yes Yes Yes
Issue of PO, track deliverables, receive & stock equipment Yes Yes Yes Yes

Support (Optional)

Post Start-up Support Yes Yes Yes Yes
Plant Management Yes Yes Yes Yes
Remote Plant Monitoring Yes Yes Yes Yes

For More information call +1 (937) 847 8050 or email us at support@jatrodiesel.com